LanderyPrivate beta

Preliminary land due diligence

Know what the land may support before your client commits.

Enter an address and describe the plan. Landery checks the home, septic area, well, driveway and accessory buildings together against parcel data, mapped constraints and local requirements.

Private beta · Selected Kent County, Michigan jurisdictions · Preliminary screening, never a permit decision

Correct parcel firstLocal rules citedNo forced favorable conclusion
Property-specific screeningHome + septic reserve + well + accessTested together against mapped evidence and supported local requirements
Current beta coverageRelease-supported: Grattan, Ada, Cannon, Vergennes, Lowell, Alpine, Byron and Plainfield. Courtland and Solon currently have parcel-specific acceptance coverage only.Coverage details →
Kent County parcel identityLocal zoning sourcesEGLE wetlandsFEMA flood hazardUSDA soilsUSGS terrain
Landery sample concept map showing a home, septic reserve, well, drive and mapped constraintsIllustrative sample · official evidence and conceptual features use different symbols

See the answer, the evidence and the uncertainty

Not another parcel map. A property-plan decision screen.

A map shows what is there. Landery helps explain what it may mean for this property and this specific plan.

Preliminary recommendationPreliminary opportunityModerate confidence · field and agency confirmation required
  • Requested components are tested together at real dimensions.
  • Alternative access and homesite possibilities are compared only when supported.
  • If no practical concept survives screening, the report says so.
Open the public sample report

Built for the decision—not the layer count

Go beyond parcel lookup and generic risk scores.

Landery carries the question further while staying honest about what public evidence cannot decide.

Parcel lookup

Find the property

Boundaries, ownership facts and individual map layers help orient the conversation.

Generic risk score

Summarize signals

A score may flag concern, but it rarely shows whether the requested home, septic system and access fit together.

The Landery difference

Test the actual plan

Test the requested home, septic reserve, well, barn and access at realistic dimensions, then show what must be verified next.

What a realtor receives

An evidence-backed first client conversation.

01

Decision summary

A plain-language preliminary conclusion, confidence and the most important next move.

02

Mapped possibilities

Realistically sized home, septic reserve, well, accessory building, yard and access concepts where evidence supports them.

03

Local requirements

A dated checklist of the township rules and confirmations that control the proposed plan.

04

Risk and cost flags

Wetlands, soils, flood hazard, terrain, access dependencies and hidden-cost questions before commitment.

05

Evidence package

A detailed PDF, map images, measurements, sources, retrieval dates and explicit limitations.

A clearer first conversation

From address to informed next step

Designed for the moment before a client spends thousands on surveys, engineering and specialist work.

01

Confirm the land

Select adjoining parcels and verify the decision unit visually.

02

Describe the goal

Size the home, barn, yard, septic, well, drive and expansion needs.

03

Compare possibilities

Review layouts, conflicts, uncertainty and hidden-cost exposure without forcing a favorable answer.

04

Share the evidence

Use the interactive report, detailed PDF, maps, measurements and dated source record.

Founding beta

The founding beta is free.

Planned post-beta pricing begins at $29 per completed property analysis. Billing is not active, and the detailed pricing hypothesis may change as we learn from testers.

See the pricing hypothesis
Aerial parcel overview from a Landery sample analysis

Answer first. Evidence always.

A client-ready answer that never pretends to be a permit.

Every conclusion carries confidence, source age and explicit limitations. Official data, derived measurements and conceptual ideas remain clearly distinguished.

Combined acreage14.42GIS acres
Screened opportunity7.24acres
Mapped wetland4.81union acres
Possibilities compared4ranked concepts
Explore the sample analysis →

Private founding beta

Five property screens. Thirty days. No charge.

Landery is currently testing the complete automated workflow with two invited Kent County real-estate professionals. Broader access is not yet available.

Analysis timing depends on property complexity, source availability and automated validation checks. Beta testers will see clear processing and blocked-analysis states.

5 property analyses30 days of private access$0 during the founding betaI already have an invitation

Questions: marketanalyst.data@gmail.com

Invitation only

Already invited?

Use the email address that received your Landery invitation. Your private workspace includes five automated analyses for 30 days.

Sign in to LanderyHave a question or want to be considered for a future test?marketanalyst.data@gmail.com

Frequently asked questions

What Landery is—and is not.

Does Landery decide whether land is buildable?

No. It provides a preliminary opportunity, material-constraints or insufficient-data conclusion and identifies professional and agency confirmation still required.

Where does the evidence come from?

County parcel and imagery services, supported local zoning sources, Michigan EGLE, FEMA, USDA NRCS, USFWS and USGS. Each report records sources and retrieval dates.

What happens when no practical building area is found?

Landery does not force a homesite. It explains the limiting evidence, lowers confidence where appropriate and recommends the smallest next verification step.

Are conceptual drives or easements legal rights?

No. They are planning possibilities only. Title, ownership, road-agency, engineering and local approvals control.